Why does an optimised tower matter?
An optimised tower carries its specified load, including the tenants you plan to add, with the least steel the design code allows. It matters because most of a tower’s delivered cost follows its weight: steel, galvanising, freight, import duty and often the foundation.
Two towers can meet the same specification and differ in weight by several percent. Both are safe. One costs more to make, ship, clear and build, on every site in the programme.
What tower weight drives
| Cost item | How weight affects it |
|---|---|
| Steel and fabrication | Priced per tonne |
| Galvanising | Priced per tonne |
| Sea freight | Fewer containers per tower |
| Import duty and taxes | Calculated on the value of the steel |
| Inland transport | Fewer truckloads, easier access to remote sites |
| Erection | Lighter members are faster and safer to lift |
| Foundation | A lighter tower with lower reactions needs less concrete |
On a programme of 500 towers, each percent of steel saved is tens of tonnes that are not bought, shipped or lifted. That saves both money and the environment.
Optimised does not mean minimal
A tower designed only for today’s antennas is cheap once and expensive later. Each new tenant then needs a strengthening project. A well-optimised tower removes steel where it is not working and keeps capacity where future tenants will need it.
Three questions separate an optimised tower from a merely light one:
- Is it designed for the actual site? Wind speed, terrain and design code for the location, not a generic worst case.
- Is it designed for the planned tenancy? Capacity for the second and third tenant where the business case expects them.
- Is every member doing work? Members with large unused capacity are steel the owner pays for and never uses.
Over-designed, under-designed, optimised
| Over-designed | Under-designed | Optimised | |
|---|---|---|---|
| Capital cost per site | Higher than needed | Lowest | Low |
| Room for new tenants | Yes, by accident | No | Yes, by design |
| Strengthening later | Rarely | Often | Planned |
What GSM does
GSM designs its own towers, with experience with mobile masts going back to 1988, and our own tower designs since 2012. We use that base to reduce steel weight at the same calculated capacity, and we document the capacity that remains for future tenants.
In short: ask your supplier for the weight per tower and the spare capacity, not only the price per tower.