Sandefjord, Norway sales@gsmtowers.com Customer portal →

Tower innovation: lighter, smarter and faster to build

Our engineering work has three aims: towers that use less steel, towers that can be inspected from the air, and sites that are faster to build. Some of this is delivered today and some is close to launch. Each item below says which.

Lighter towers Available today

We have designed our own towers since 2012. We use that design history to reduce steel weight at the same capacity, which lowers the cost of steel, freight, duty and erection. Why does an optimised tower matter? →

Drone-ready towers Final development

A drone-ready tower is marked and documented at the factory so that a drone inspection can identify each part, confirm bolt tension and measure the structure against its design. The specification is in final development with partners in drone inspection and structural analysis. What makes a telecom tower drone-ready? →

Foundations without concrete In development

Screw-anchor foundations that shorten build time on sites where ground conditions allow.

Digital delivery Available today

Customers follow orders, shipments and documents in the GSM customer portal.

Talk to us

Tell us what you are building. We respond within two working days.