Rollout management: rent the rollout organisation

Building a tower portfolio takes an organisation as well as towers. GSM provides that organisation: experienced rollout leaders, a process that covers every site from award to final acceptance, and the systems to run it. You own the portfolio and the decisions. We own the delivery.

The service is built for new tower companies, merged portfolios and market entries, where the capital is committed before the organisation exists.

Proven in operation. GSM has run rollout management for a tower company in the Philippines since 2021. In that time the portfolio has grown to more than 4,000 towers, through new build, a sale-and-leaseback and a merger. Seven GSM specialists work inside the customer's organisation.

What you get

Leadership

Senior GSM people seconded into your organisation, in roles such as head of rollout, engineering, civil works, procurement, quality and transformation. They report to your management and sit with your team.

Process

One process for every site, with defined stages, gates and owners, and a weekly steering committee per workstream.

Systems

A single system of record for milestones and documents, engineering and tracking tools, and a weekly status pack. We work in your system if you have one, or bring ours.

Delivery

Towers from GSM and civil works from our own construction company, on the same schedule as the rollout.

The process, stage by stage

  1. Award and screening. Sites are registered, screened and prioritised.
  2. Site acquisition to ready for construction. Site hunting, technical survey, property documents, detailed design, bill of quantities and budget, permits.
  3. Construction. Purchase order, mobilisation, foundation, tower erection, electrical works and fencing, ready for installation.
  4. Power. DC installation, grid connection and energisation.
  5. Closeout to cash. Acceptance testing, handover documents, final acceptance and invoicing.
  6. Lifecycle. Colocation, strengthening and retrofit, and power upgrades on the towers already built.

Three ways to engage

Rollout Control
Level 1
Managed Rollout
Level 2
Full Backbone
Level 3
Who runs the rolloutYour team, led by a GSM rollout leadGSM's seconded leadership teamGSM's seconded leadership team
GSM leadershipOne rollout leadFull leadership teamFull leadership team
Process and steering committeeYesYesYes
Systems and weekly status packYesYesYes
Towers and civil works from GSMNoNoYes
Best forA team that exists and needs structureA portfolio without a rollout organisationOne partner for organisation, steel and build

Why rent instead of build

Cost follows your capex.

The organisation scales up when you build and down when you slow.

Continuity.

The rollout keeps running through changes of owner, management and strategy.

One owner of delivery.

A consultant carries no delivery risk and a contractor has no stake in the pipeline. We carry both.

Built for the whole lifecycle.

The same organisation handles colocation, strengthening and power upgrades after the build programme ends.

Experience with transactions.

We have carried out technical due diligence and integration for a sale-and-leaseback and a merger.

How we start

  1. Diagnostic, weeks 1–4. We review your pipeline, organisation and systems and give you a rollout plan. It stands alone: the plan is yours whether or not we continue.
  2. Design, weeks 5–8. Roles, process, systems and targets are agreed.
  3. Mobilise, weeks 9–12. The seconded team is in place and the first steering committee is held.
  4. Run. Weekly steering, monthly reporting and an annual review of scope.

Start with a four-week diagnostic

We review your pipeline, organisation and systems and give you a rollout plan. The plan is yours whether or not we continue together.